Amendment ID: S2545-7

Amendment 7

Re-licensing process of small-scale hydro facilities

Messrs. Hinds and O'Connor, Ms. Gobi and Mr. Lewis move that the proposed new draft be amended by adding at the end thereof the following new sections:-

“SECTION XX. Section 11F of chapter 25A of the General Laws, as so appearing, is hereby amended by striking out subsection (c) and inserting in place thereof the following subsection:-

(c) New and relicensed renewable energy generating sources meeting the requirements of this subsection shall be known as Class I renewable energy generating sources. For the purposes of this subsection, a Class I renewable energy generating source is one that began commercial operation after December 31, 1997, or represents the net increase from incremental new generating capacity after December 31, 1997 at an existing facility, or receives a new license after January 1, 2018, under the Federal Energy Regulatory Commission rules, 18 Code of Federal Regulations, Part 16, where the facility generates electricity using any of the following: (1) solar photovoltaic or solar thermal electric energy; (2) wind energy; (3) ocean thermal, wave or tidal energy; (4) fuel cells utilizing renewable fuels; (5) landfill gas; (6) energy generated by new and relicensed hydroelectric facilities, or incremental new energy from increased capacity or efficiency improvements at existing hydroelectric facilities; provided, however, that (i) each such new or relicensed facility or increased capacity or efficiency at each such existing facility must meet appropriate and site-specific standards that address adequate and healthy river flows, water quality standards, fish passage and protection measures and mitigation and enhancement opportunities in the impacted watershed as determined by the department in consultation with relevant state and federal agencies having oversight and jurisdiction over hydropower facilities; (ii) only energy from new and relicensed facilities having a capacity up to 30 megawatts or attributable to improvements that incrementally increase capacity or efficiency by up to 30 megawatts at an existing hydroelectric facility shall qualify; and (iii) no such facility shall involve pumped storage of water or construction of any new dam or water diversion structure constructed later than January 1, 1998; (7) low emission advanced biomass power conversion technologies using fuels such as wood, by-products or waste from agricultural crops, food or animals, energy crops, biogas, liquid biofuel including but not limited to biodiesel, organic refuse-derived fuel, or algae; (8) marine or hydrokinetic energy as defined in section 3; or (9) geothermal energy. A Class I renewable generating source may be located behind the customer meter within the ISO-NE control area if the output is verified by an independent verification system participating in the NEPOOL GIS accounting system and approved by the department.

SECTION XX. Section 11F of chapter 25A of the General Laws, as so appearing, is hereby amended by striking out subsection (d) and inserting in place thereof the following subsection:-

(d) Every retail electric supplier providing service under contracts executed or extended on or after January 1, 2009, shall provide a minimum percentage of kilowatt-hour sales to end-use customers in the commonwealth from Class II renewable energy generating sources. For the purposes of this section, a Class II renewable energy generating source is one that began commercial operation before December 31, 1997 and generates electricity using any of the following: (1) solar photovoltaic or solar thermal electric energy; (2) wind energy; (3) ocean thermal, wave or tidal energy; (4) fuel cells utilizing renewable fuels; (5) landfill gas; (6) energy generated by existing hydroelectric facilities, provided that such existing facility shall meet appropriate and site-specific standards that address adequate and healthy river flows, water quality standards, fish passage and protection measures and mitigation and enhancement opportunities in the impacted watershed as determined by the department in consultation with relevant state and federal agencies having oversight and jurisdiction over hydropower facilities; and provided further, that only energy from existing facilities up to 7.5 megawatts shall be considered renewable energy and no such facility shall involve pumped storage of water nor construction of any new dam or water diversion structure constructed later than January 1, 1998; (7) waste-to-energy which is a component of conventional municipal solid waste plant technology in commercial use; (8) low emission advanced biomass power conversion technologies using fuels such as wood, by-products or waste from agricultural crops, food or animals, energy crops, biogas, liquid biofuel including but not limited to biodiesel, organic refuse-derived fuel, or algae; (9) marine or hydrokinetic energy as defined in section 3; or (10) geothermal energy. A facility in clause (6) shall no longer be a Class II renewable generating source if it  receives a new license after January 1, 2018, under the Federal Energy Regulatory Commission rules, 18 Code of Federal Regulations, Part 16 and provides formal notification to the department that the facility seeks to participate as a Class I renewable generating source. A facility in clause (7) shall not be a Class II renewable generating source unless it operates or contracts for one or more recycling programs approved by the department of environmental protection. At least 50 per cent of any revenue received by the facility through the sale of Massachusetts RPS-eligible renewable energy certificates shall be allocated to such recycling programs. A Class II renewable generating source may be located behind the customer meter within the ISO-NE control area provided that the output is verified by an independent verification system participating in the NEPOOL GIS accounting system and approved by the department.”