Amendment #70 to H.4179

Route 53 Barrier Replacement

Mr. Murphy of Weymouth move that the bill be amended in section 2A Line Item 6121-1217 in line 48, by inserting after the word “costs;” to include “provided, that not less than $250,000 shall be expended on the Weymouth Washington St. (Route 53) at Middle St. and Winter St. Project for the repair or replacement and upgrade of the Winter St. concrete barrier and chain-link fencing with picket post cap fencing”.