HOUSE DOCKET, NO. 1908        FILED ON: 1/19/2017

HOUSE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  No. 1766

 

The Commonwealth of Massachusetts

_________________

PRESENTED BY:

Mathew Muratore

_________________

To the Honorable Senate and House of Representatives of the Commonwealth of Massachusetts in General
Court assembled:

The undersigned legislators and/or citizens respectfully petition for the adoption of the accompanying bill:

An Act to improve water sub-metering in manufactured housing communities.

_______________

PETITION OF:

 

Name:

District/Address:

Date Added:

Mathew Muratore

1st Plymouth

1/19/2017

Angelo L. D'Emilia

8th Plymouth

 


HOUSE DOCKET, NO. 1908        FILED ON: 1/19/2017

HOUSE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  No. 1766

By Mr. Muratore of Plymouth, a petition (accompanied by bill, House, No. 1766) of Mathew Muratore and Angelo L. D'Emilia relative to water sub-metering in manufactured housing communities.  Telecommunications, Utilities and Energy.

 

[SIMILAR MATTER FILED IN PREVIOUS SESSION
SEE HOUSE, NO. 2902 OF 2015-2016.]

 

The Commonwealth of Massachusetts

 

_______________

In the One Hundred and Ninetieth General Court
(2017-2018)

_______________

 

An Act to improve water sub-metering in manufactured housing communities.

 

Be it enacted by the Senate and House of Representatives in General Court assembled, and by the authority of the same, as follows:
 

SECTION 1. Chapter 40 of the General Laws, is hereby amended by inserting the following new section at the end thereof:

In order to assist with assuring that all residents residing in Manufactured Housing are treated equally and to preserve scarce natural resources, water sub metering may be required by the owner or operator of any Manufactured Housing Community in the Commonwealth; in the event that such owner   or operator elects to do this, each and every resident shall be required to share equally in any and all costs associated with such sub-metering and provided, further, that notwithstanding that this is a capital cost, this cost may be recouped by the owner or operator at the time of installation of the sub-metering and shall not be collected as though it were a capital cost.