SECTION 1. Section 40 of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is hereby amended by inserting the following terms therein:-
“Marking standards”, the methods by which a company designates its facilities in accordance with standards established by the Common Ground Alliance (CGA) and the American Public Works Association.
“Non-mechanical means”, shall mean excavation using any device or tool manipulated by human power, including air vacuum, air blowing or similar methods of excavation designed to minimize direct contact with utilities.
SECTION 2. Section 40 of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is hereby amended by inserting in line 5, after the words “cable television company, and”, the following words:- municipal traffic signal departments
SECTION 3. Section 40 of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is hereby amended by inserting the following terms therein:-
“Professional Land Surveyor”, shall have the same definition as set forth in M.G.L. c.112, §81D.
SECTION 4. Section 40A of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is hereby amended by inserting after the first paragraph the following paragraph:-:
Any Professional Land Surveyor working on a preliminary design for a new facility or renovation where excavation shall be necessary shall premark the proposed excavation and give initial notice to the system.
SECTION 5. Section 40B of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is hereby amended by inserting after the words “the excavator” the following words:- or Professional Land Surveyor
SECTION 6. Section 40B of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is hereby amended by inserting the following sentences at the end thereof:-
At a minimum, all markings shall indicate, where practicable, the width if it is greater than two inches, the material of the underground facility, the existence of multiple ducts, as well as any change in direction and any terminus points of the facility. In circumstances where the total number of lines buried in the same trench may not be readily known, a corridor marker may be used.
A company shall conduct periodic audits to ensure the accuracy of the locating and marking of facilities as well as its adherence to marking standards.
SECTION 7. Section 40E of Chapter 82 of the general laws, as appearing in the 2014 Official Edition, is amended by inserting the following sentences at the end thereof:-
The department of public utilities may require any person or company who does not comply with the provisions of sections 40A to 40E to complete a “Dig Safe” training program in lieu of a fine for a first offense. The penalties provided for in this section shall not apply to an excavator who damages an underground facility due to the failure of the company to comply with the provisions of section 40A to 40E.
The information contained in this website is for general information purposes only. The General Court provides this information as a public service and while we endeavor to keep the data accurate and current to the best of our ability, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.