HOUSE DOCKET, NO. 3271 FILED ON: 1/18/2019
HOUSE . . . . . . . . . . . . . . . No. 1810
|
The Commonwealth of Massachusetts
_________________
PRESENTED BY:
Christina A. Minicucci
_________________
To the Honorable Senate and House of Representatives of the Commonwealth of Massachusetts in General
Court assembled:
The undersigned legislators and/or citizens respectfully petition for the adoption of the accompanying bill:
An Act to mandate setbacks in home construction near high pressure gas pipelines.
_______________
PETITION OF:
Name: | District/Address: | Date Added: |
Christina A. Minicucci | 14th Essex | 1/15/2019 |
Linda Dean Campbell | 15th Essex | 2/1/2019 |
Mindy Domb | 3rd Hampshire | 2/1/2019 |
HOUSE DOCKET, NO. 3271 FILED ON: 1/18/2019
HOUSE . . . . . . . . . . . . . . . No. 1810
By Ms. Minicucci of North Andover, a petition (accompanied by bill, House, No. 1810) of Christina A. Minicucci, Linda Dean Campbell and Mindy Domb relative to home construction near certain high pressure gas pipelines. Municipalities and Regional Government. |
The Commonwealth of Massachusetts
_______________
In the One Hundred and Ninety-First General Court
(2019-2020)
_______________
An Act to mandate setbacks in home construction near high pressure gas pipelines.
Be it enacted by the Senate and House of Representatives in General Court assembled, and by the authority of the same, as follows:
SECTION 1. Chapter 41 of the General Laws is hereby amended by inserting in section 81M the following language:-
Section 81M is hereby amended by inserting after "securing safety in the case of fire, flood, panic and other emergencies;" the text "insuring appropriate setbacks from high-pressure natural gas transmission pipelines."
SECTION 2. Chapter 41 of the General Laws is hereby amended by inserting in section 81U the following language:-
Section 81U is hereby amended by replacing the text "Failure of such board or officer to report shall be deemed approval by such board or officer" the text:
In the event that the proposed subdivision includes residential structures located within 75 feet of an existing high-pressure gas transmission pipeline easement that contains a pipeline with a MAOP (Maximum operating pressure) of at least 300 psi, or within 100 feet of an existing gas transmission line easement containing a pipeline with MAOP greater than 1000psi, the person submitting the plan must provide to the board of health upon submission of the plan a map showing the actual placement of the pipeline within that easement, and the board of health shall be required to issue a report on the definitive plan, and is required to hold a public hearing on the plan to consider issues related to prevention of natural gas pipeline explosions. The board of health shall provide notice of the public hearing in coordination with the planning board, or on its own using the same notification procedures as required by section 81T of the planning board. The board of health shall verify that the following minimum setbacks between a new residence and a pipeline are met: 50 feet for pipelines with a pressure of 300-599 psi; 75 feet for pipelines of 600-1000psi; 100 feet for pipelines with a pressure greater than 1000psi. The board of health may adopt local regulations with greater setback requirements than those specified in this section.
If the event that no report on gas pipeline proximity is trigged by this section, failure of the board of health or its officer to report shall be deemed approval by such board or officer.