SENATE DOCKET, NO. 1557 FILED ON: 1/19/2023
SENATE . . . . . . . . . . . . . . No. 2112
|
The Commonwealth of Massachusetts
_________________
PRESENTED BY:
Julian Cyr
_________________
To the Honorable Senate and House of Representatives of the Commonwealth of Massachusetts in General
Court assembled:
The undersigned legislators and/or citizens respectfully petition for the adoption of the accompanying bill:
An Act relative to improving reliability and resiliency of electricity distribution infrastructure.
_______________
PETITION OF:
Name: | District/Address: |
|
Julian Cyr | Cape and Islands |
|
Lindsay N. Sabadosa | 1st Hampshire | 2/22/2023 |
SENATE DOCKET, NO. 1557 FILED ON: 1/19/2023
SENATE . . . . . . . . . . . . . . No. 2112
By Mr. Cyr, a petition (accompanied by bill, Senate, No. 2112) of Julian Cyr and Lindsay N. Sabadosa for legislation to improve reliability and resiliency of electricity distribution infrastructure. Telecommunications, Utilities and Energy. |
[SIMILAR MATTER FILED IN PREVIOUS SESSION
SEE SENATE, NO. 2156 OF 2021-2022.]
The Commonwealth of Massachusetts
_______________
In the One Hundred and Ninety-Third General Court
(2023-2024)
_______________
An Act relative to improving reliability and resiliency of electricity distribution infrastructure.
Be it enacted by the Senate and House of Representatives in General Court assembled, and by the authority of the same, as follows:
Notwithstanding any general or special law to the contrary, upon the undertaking of a significant project on a public way exposing wastewater infrastructure, and with sufficient notice, a municipality or the commonwealth shall submit written notification of the project to the electrical utility. The utility shall survey the project area for the reliability of electrical distribution lines and review repair and replacement schedules for electrical lines in the project area. The utility shall also assess the resiliency of electrical transmission lines relative to climate resiliency, including but not limited to impacts from coastal storms. The electrical utility shall provide the repair and replacement schedule of transmission lines to the municipality or the commonwealth.