Amendment #127 to H3860

Nantucket industrial park roadway

Mr. Madden of Nantucket moves to amend the bill in Section 2A, in line 200, by inserting after the figure “$2,978,603,273” the words “provided further, that $1,614,000 shall be expended for design and construction of 0.7 miles of roadway, drainage, and utility infrastructure for an existing 31.8 acre industrial park located within a 43D priority development area east of the Nantucket Airport in Nantucket;”