Further Amendment #263.1 to H3860

Consolidated further

Mr. Dempsey moves to further amend amendment #263 Mr. Dempsey of Haverhill moves to further amend the consolidated amendment by striking it in its entirety and inserting in place thereof the following:-

 

1, 3, 4, 5, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 63, 64, 65, 66, 67, 68, 69, 71, 72, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 87, 88, 89, 90, 91, 92, 93, 94, 95, 97, 98, 99, 100, 101, 102, 103, 104, 106, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 119, 120, 121, 122, 124, 125, 126, 127, 129, 130, 131, 132, 134, 135, 136, 137, 138, 139, 141, 142, 144, 145, 146, 148, 149, 150, 151, 152, 153, 154, 155, 156, 158, 159, 160, 161, 162, 163, 164, 165, 166, 168, 169, 170, 171, 172, 173, 176, 177, 178, 179, 180, 181, 182, 183, 184, 190, 192, 194, 199, 200, 201, 202, 203, 205, 206, 207, 208, 210, 213, 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 225, 226, 228, 229, 230, 231, 232, 234, 235, 236, 237, 238, 240, 242, 245, 246, 247, 248, 249, 250, 252, 253, 254, 255, 256, 257, 258, 260

 

Mr. Dempsey of Haverhill moves to amend H.3860 in section 2A by inserting after the words “New Bedford”, in line 200, the following:-

 

; provided further, that $5,200,000 shall be expended for reconstruction and related work, including design costs, on Atlantic avenue from Nantasket avenue to the Cohasset town line in the town of Hull; provided further, that $985,000 shall be expended for traffic mitigation and construction of pedestrian-oriented street layouts, center island, bicycle pathways, lighting and sidewalk improvements to Main street in the town of Wakefield; provided further, that $495,000 shall be expended for transit access enhancements and roadway and streetscape improvements on the Washington Street Smart Growth Corridor in the city of Melrose and the city of Malden; provided further, that $1,500,000 shall be expended for the design and construction of “complete streets” improvements on Route 113 from High street to Daniel Lucy drive in the city of Newburyport; provided further, that $1,500,000 shall be expended for Clipper City Rail Trail Phase III link design and construction from Parker street to the Newburyport MBTA Station in the city of Newburyport; provided further, that $700,000 shall be expended to replace or restore the historic ironwork railings on Route 1 at High, Winter, Washington and Summer streets in the city of Newburyport; provided further, that $75,000 shall be expended for the study and planning for the Merrimack River water shuttle in conjunction with the executive office of energy and environmental affairs in the cities of Newburyport and Amesbury and the town of Salisbury; provided further, that $1,000,000 shall be expended for access to stairs or ramp and parking to the Route 95 Whittier Bridge shared-use path at Main street in the city of Amesbury; provided further, that $1,250,000 shall be expended for the design and reconstruction with streetscape of Route 150 historic gateway on Market street to Main street in the city of Amesbury; provided further, that $1,800,000 shall be expended for the Powow River Rail Trail link from Rocky Hill road to Elm street in the city of Amesbury; provided further, that $1,500,000 shall be expended for the Route 95 Ghost Rail Trail Route 95 underpass connector from Rabbit road in the town of Salisbury to Elm street in the city of Amesbury; provided further, that $2,400,000 shall be expended for the design and resurface with sidewalks for Route 1A from Beach road to Route 286 in the town of Salisbury; provided further, that $1,200,000 shall be expended to study the drainage issues and design, permit and resurface raised Route 1A (Beach road at County road) in the town of Salisbury; provided further, that $1,200,000 shall be expended for the resurface and drainage work for Route 1 from the Gillis Bridge to School street in the town of Salisbury; provided further, that $1,000,000 shall be expended for the traffic safety improvements at Winthrop street and High street rotary; provided further, that $15,000,000 shall be expended for the design of grade separation at Wellington Circle in the city of Medford; provided further, that $7,500,000 shall be expended for the construction of a parking garage in Medford square in the city of Medford; provided further, that $2,500,000 shall be expended for the design and construction of signal road and pedestrian improvements in Medford square including repaving of Riverside street from Main street to City Hall Mall in the city of Medford; provided further, that $75,000 shall be expended for the reconstruction of the sidewalk on the northerly side of upper Broadway in the city of Malden; provided further, that $3,910,000 shall be expended for roadway and streetscape improvements for downtown Malden; provided further, that $1,500,000 shall be expended for the reconstruction of Route 99 between Salem street and Elwell street in the city of Malden; provided further, that $1,000,000 shall be expended for the installation of a sewer line as part of road improvements along Main street in the town of Freetown; provided further, that $1,450,000 shall be expended for the construction and replacement of the Champeaux road bridge in the town of Sturbridge; provided further, that $200,000 shall be expended for the design and repair of, and make improvements to, the Healdville road bridge in the town of Hubbardston; provided further, that $16,000,000 shall be expended to design, reconstruct and make improvements to roadways and sidewalks, to enhance traffic flow, vehicle parking, traffic safety, and public access to a regional commercial tourist district, including, traffic signals, construction of a vehicle rotary, lighting, pedestrian and bicycle related amenities, and landscaping, to Main street, Route 20, from the intersections of New Boston road to Brookfield road, Route 148, in the town of Sturbridge; provided further, that $25,000,000 shall be expended for the expansion of the National Park Trolley’s 1.2 mile current infrastructure into a 6.9 mile intermodal, interconnected system connecting Lowell’s neighborhoods, college and university campuses, and downtown commercial and cultural district; provided further, that $2,000,000 shall be expended to reconfigure the Bark street/Stevens street intersection through the use of a roundabout in the town of Swansea; provided further, that $750,000 shall be expended for the reconstruction of sidewalks on High street in the city of Taunton to meet ADA compliance; provided further, that $17,000,000 shall be expended for the completion of the rapid transit accessibility project for the Auburndale Commuter Rail Station in the city of Newton; provided further, that $800,000 shall be expended for the emergency repair of the Powder Mill Brook bridge on Main road in the town of Montgomery; provided further, that $350,000 shall be expended for the relining and repair of a culvert on Northwest road in the town of Westhampton; provided further, that $2,000,000 shall be expended for the emergency repair of the East street bridge in the town of Southampton; provided further, that $850,000 shall be expended for the construction of a bike path in the town of Southampton; provided further, that $900,000 shall be expended for the reconstruction of portions of Fomer and Russellville roads in the town of Southampton; provided further, that $125,000 shall be expended to study safety improvements, including traffic lights and sidewalks, on College highway in the town of Southampton; provided further, that $1,600,000 shall be expended for the emergency repair of the retaining wall and adjacent roadway on River road in the city of Northampton; provided further, that $100,000 shall be expended for the design of safety improvements in the Finn street and North street corridor in the city of Northampton; provided further, that $500,000 shall be expended for engineering and repairs to the historic Clement street bridge in the city of Northampton; provided further, that $355,000 shall be expended for the rehabilitation of the rail trail in the city of Northampton; provided further, that $2,387,000 shall be expended for the reconstruction and paving of King street in the city of Northampton; provided further, that $1,550,000 shall be expended for safety improvements at the intersection of New South street, Main street, Elm street and State street in the city of Northampton; provided further, that $75,000 shall be expended for safety improvements at the intersection of Ryan road and Florence road in the city of Northampton; provided further, that $1,000,000 shall be expended for the emergency repair of Carrington road in the towns of Russell and Montgomery; provided further, that $1,300,000 shall be expended for reconstruction of Waltham street from the Waltham line to Rosedale road in the town of Watertown; provided further, that $725,000 shall be expended for the various improvements and to create a coordinated multi-use community path through the center of the town of Watertown; provided further, that $500,000 shall be expended for transportation hub improvements at Watertown square, including redesign of the delta and improved signage for Galen street in the town of Watertown; provided further, that $250,000 shall be expended for the upgrade of traffic signals at the intersection of Marble street and Park street in the town of Stoneham; provided further, that $1,000,000 shall be expended for the installation of traffic signals at the intersection of Route 28/Main street and North street in the town of Stoneham; provided further, that $500,000 shall be expended for the upgrade of traffic signals at the intersections of Main and William streets, Main and Elm streets, Elm and Central streets, and William and Central streets, all in the town of Stoneham; provided further, that $500,000 shall be expended for the repair and rehabilitation of the bridge across the Aberjona river on Mount Vernon street in the town of Winchester; provided further, that $1,614,000 shall be expended for design and construction of 0.7 miles of roadway, drainage and utility infrastructure for an existing 31.8 acre industrial park located within a 43D priority development area east of the Nantucket airport in town of Nantucket; provided further, that the Massachusetts Department of Transportation shall properly cap the ramp at the I-93 off ramp parcel 12 off of Cross street in the city of Boston, as laid out in the Central Artery Mitigation agreements, by November 1, 2017; provided further, that $5,000,000 shall be expended for improvement to the Route 3A corridor including, but not limited to, road and infrastructure improvements in the town of Weymouth; provided further, that $2,000,000 shall be expended for improvements to Route 53 Washington street Weymouth landing area in the town of Weymouth; provided further, that $1,000,000 shall be expended for sidewalk improvements and reconstruction on Route 53 for the section known as the “Stephen P. O’Donnell Memorial Highway” in the town of Weymouth; provided further, that $3,000,000 shall be expended for the resurfacing and improvements to the Colombian square corridor in the town of Weymouth; provided further, that $900,000 shall be expended for the design and construction of the transit-oriented development of an overhead enclosed pedestrian walkway connecting the Gallagher Transportation Center and the Old Thorndike Factory Outlet Building located at 145 Thorndike street in the city of Lowell; provided further, that $1,000,000 shall be expended for the construction of sound barriers along route 290 in the town of Northborough; provided further, that $100,000 shall be expended for an engineering study to review traffic intersections in and around the North Beverly train station, including Laurel, Dodge and Enon streets (route 1A) and recommend improvements to address traffic issues in the city of Beverly; provided further, that $360,000 shall be expended for the construction of route 137 from route 124 to route 6A in the town of Brewster; provided further, that $275,000 shall be expended for the completion of drainage at Betty’s Curve on route 6A by Paines Creek in the town of Brewster; provided further, that $1,500,000 shall be expended for the reconstruction of Oceanview drive in the town of Eastham; provided further, that $1,500,000 shall be expended for the reconstruction of Lieutenants Island road in the town of Wellfleet; provided further, that $100,000 shall be expended for the reconstruction of the Main street – route 6A intersection in the town of Wellfleet; provided further, that $1,000,000 shall be expended for the planning, design, construction, and any other associated costs for transportation improvements at the intersection of route 9 (Worcester street) and Kingsbury street in the town of Wellesley; provided further, that $1,000,000 shall be expended for the planning, design, construction, and any other associated costs for traffic mitigation work along route 9 and Weston road attributable to the development of 900 Worcester street in the town of Wellesley; provided further, that $200,000 shall be expended to delead and repaint the bridge on Cliff road over the railroad tracks in the town of Wellesley; provided further, that $300,000 shall be expended for safety study and improvements for the intersection of route 140 and Panther way in the town of Franklin; provided further, that $600,000 shall be expended for handicapped accessibility improvements and crosswalks to cross Centre street in Jamaica Plain at Rambler road, Westchester road and Whitcomb avenue in the city of Boston; provided further, that $400,000 shall be expended for the removal of debris and structures of the old Hix bridge on the east branch of the Westport river in the town of Westport; provided further, that $250,000 shall be expended for planning, design and permitting for improvements to Chipaway road in the town of Freetown; provided further, that $250,000 shall be expended for planning, design and permitting for improvements to Chace road in the town of Freetown ; provided further, that $400,000 shall be expended for the replacement or removal of electronic traffic signals on route 2 in the towns of Phillipston and Athol; provided further, that $2,000,000 shall be expended for the purchase, planning, design and construction of a scenic pedestrian river walk and bicycle pathway from South Main street in the town of Athol to West River street in the town of Orange; provided further, that $200,000 shall be expended for an engineering study to examine the feasibility of constructing a ramp on the north side of route 2A, between Crescent street and Chestnut Hill avenue in the town of Athol; provided further, that $500,000 shall be expended to study the cost and feasibility of using current commuter rail infrastructure for the Massachusetts Bay Transit Authority’s Fitchburg/South Acton line continuing to run along the tracks into Albany, New York; provided further, that $725,000 shall be expended for the replacement of the Beaver Brook bridge located on Beaver Brook road in the town of Westford; provided further, that $800,000  shall be expended to expand the state owned Commander Shea boulevard into Squantum Point Park to open access for establishing a ferry service in the interest of transportation and tourism in the city of Quincy; provided further, that $800,000 shall be expended for traffic signalization at the intersection of route 140 and Central street within the town of Foxborough; provided further, that $750,000 shall be expended for traffic signalization at the intersection of route 123 and route 140 within the town of Norton; provided further, that $500,000 shall be expended for accommodating two-way traffic on North Main street, including street lighting and street parking on Mansfield avenue within the town of Mansfield; provided further, that $5,000,000.00 shall be expended  for the design, build and construction to restore the two way traffic circulation in downtown Brockton replacing the existing one way system on Main street, Belmont street and Warren avenue; provided, further that $4,200,000 shall be expended for improvements to 11 priority intersections in the neighborhoods of Dorchester, South End, East Boston, Mattapan, and Roxbury in the city of Boston; provided, further that $500,000 shall be expended for the Massachusetts Department of Transportation to commission a study to determine if existing traffic volume in and around Mattapan square in the city of Boston exceeds the intended capacity of the current roadways; provided, further that said study shall include, but is not limited to, examining if existing traffic signals are synced appropriately and the study shall propose possible traffic flow improvements in and around Mattapan square on Blue Hill avenue from Walk Hill street through Mattapan square in the city of Boston to the intersection of Blue Hills parkway, Brush Hill road, and Eliot street in the town of Milton; provided, further that $500,000 shall be expended for beautification and streetscape improvements to Mattapan square including, but not limited to, the planting of trees in the median of Blue Hill avenue from Mattapan square to Woodhaven street,  the repainting of traffic lines and bicycle lanes on Blue Hill avenue from Mattapan square to Walk Hill street, and the repainting of Mattapan square business district parking spaces in the Mattapan section of the city of Boston; provided further, that $100,000 shall be expended for the repair and construction of a bridge to allow handicapped access and for the installation of a fish ladder at Herring Run Park in the town of Pembroke; provided further, that $25,000 shall be expended for the design and construction of scenic trails in the town of Duxbury; provided further, that $5,000,000 shall be expended for design and reconstruction of Brattle and Eliot streets in the Harvard Square neighborhood in the city of Cambridge; provided further, that $8,500,000 shall be expended for design and reconstruction of River street from Memorial drive to Central square in the city of Cambridge; provided further, that $6,000,000 shall be expended  for the construction of an intermodal transportation center and parking garage in the town of Plymouth; provided further,  that $500,000 shall be expended to design and construct safety improvements at the intersection of John Fitch highway and North street near the Fitchburg State University commuter parking lot in the city of Fitchburg; provided further,  that $300,000 shall be expended for construction of improvements to Boulder drive from Upper Common to Putnam street for sidewalks, paving, traffic calming and streetscape improvements per the study by the Urban Ecology Institute and city's Main Street Improvement Plan in the city of Fitchburg; provided further, that $820,000 shall be expended for construction of improvements to Princeton road to include bicycle and pedestrian accommodations and paving in conjunction with the Wachusett Station Project in the city of Fitchburg; provided further, that $400,000 shall be expended to construct a roundabout at the intersection of Electric avenue and Rollstone road in the city of Fitchburg; provided further, that $1,000,000 shall be expended for the reconstruction of route 31 in the town of Spencer from a point approximately three quarter mile south of route 9 to the Charlton town line; provided further, that $150,000 shall be expended for the replacement of the Dilla street bridge at Louisa Lake in the town of Milford; provided further, that $200,000 shall be expended to reconstruct Lake Street in the town of Hopedale, including 1,350 linear feet of road and 1,600 linear feet of sidewalk; provided further, that $1,200,000 shall be expended to reconstruct route 16 in Milford at the intersection of Medway road (route 109), including replacement of concrete sidewalks, signalization and other traffic improvements; provided further, that $3,600,000 shall be expended to reconstruct route 16, Mendon street, in the town of Hopedale from the Mendon town line to Adin street at the Milford town line; provided further, that $100,000 shall be expended to demolish and remove asbestos from a house on DPW property in the town of Millbury; provided further, that $350,000 shall be expended for moving and replacing the underground storage tanks for gas and diesel for the town of Millbury department of public works; provided further, that $100,000 shall be expended to repair drainage on Stowe road in the town of Millbury; provided further, that $500,000 shall be expended for signage, bicycle and pedestrian accommodations, beautification and other roadway enhancements for square in the town of Auburn; provided further, that $75,000 shall be expended for the initial design and permit scoping for a commuter rail station in the town of Wareham; provided further, that $75,000 shall be expended for Buzzards Bay train station ADA compliance cost study within the town of Bourne; provided further, that 2,500,000 shall be expended for the repair restoration and resurfacing of Searles Hill road, Lincoln road, Whitney road, Little Blake Corner road, Petersham road and Old Highland avenue, in the town of Phillipston; provided further, that $3,000,000 shall be expended to design, reconstruct, restore, re-surface, widen and make safety and other improvements to roadways and sidewalks, to improve pedestrian and bicycle safety including, guard rails, crosswalks, retaining walls, street lighting and the replacement and repair of appurtenances, culverts and related improvements and landscaping, from the intersection of Main street and Pommogussett road to a point approximately 1 mile north on Pommogussett road, in the town of Rutland; provided further, that $900,000 shall be expended to design, reconstruct, restore, re-surface and make improvements to roadways and sidewalks, to improve pedestrian, bicycle and school traffic, including, the replacement and repair of manhole frames and covers, catch basins and covers, fire hydrants street lights and landscaping, from Maple avenue through the Rutland Heights Hospital property and past Central Tree Middle School and Naquag Elementary School, in the town of Rutland; provided further, that $5,000,000 shall be expended for design, construction, repair, or improvements to pedestrian, bicycle, and public parking areas, and multi-use pathways in Chelmsford Center in the town of Chelmsford; provided further, that $500,000 shall be expended for design and permitting to improve safety, bus prioritization, and accessibility at the intersection of Fresh Pond parkway and Mount Auburn street in the city of Cambridge; provided further, that $5,000,000 shall be expended to advance the permitting and design of the reconstruction of I-290 and I-495 Interchange and bridge replacement in the town of Hudson and city of Marlborough; provided further, that $1,300,000 shall be expended for construction of Phase II of the Watertown Greenway multi-use path from Arlington street in the town of Watertown to Fresh Pond Reservation in the city of Cambridge; provided further, that $200,000 shall be expended for a study of transportation improvements in support of land use changes and economic development on Arsenal street in the town of Watertown; provided further,  that $500,000 shall be expended for the design of a bicycle/pedestrian bridge linking the Alewife quadrangle to the Alewife triangle and the MBTA Alewife station in the city of Cambridge; provided further that $200,000 be expended for the implementation of additional opticon monitors on intersections and fire trucks in the town of Milton; provided further that $60,000 be expended on the implementation and installation of additional opticon monitors in the Town of Randolph; provided further, that $1,450,000 shall be expended for the replacement of the Champeaux Road Bridge, connecting Sturbridge through Army Corps of Engineers lands and crossing over the Brimfield Reservoir in the town of Sturbridge; provided further, that $1,000,000 shall be expended for the reconstruction of route 12 in the city of Leominster from Union street to the Leominster/Sterling line; provided further, that $500,000 shall be expended for street and sidewalk resurfacing on Pleasant street in Arlington; provided further, that $1,520,000 shall be expended for construction and oversight of the reconstruction of Belmont Center in Belmont; provided further, that $1,000,000 shall be expended for the Smith street roadway and sidewalk reconstruction in the town of North Attleboro; provided further, that $1,000,000 shall be expended for Chestnut street road and intersection improvements in the town of North Attleboro; provided further, that $3,200,000 shall be expended for Kelley boulevard roadway improvements in the town of North Attleboro; provided further, that $2,000,000 shall be expended  for railroad crossings within the towns of Grafton, Hopedale, Milford, and Upton; provided further, that $400,000 shall be expended  for the design and permitting of the route 79 improvement project in the town of Lakeville; provided further, that $5,000,000 shall be expended for the redesign and reconfiguration of Rutherford avenue and Sullivan Square in the Charlestown section of the city of Boston; provided further, that $75,000,000 shall be expended for road relocation and other transportation related improvements, including bicycle and pedestrian paths and the repair and rehabilitation of the Harbor Walk, on the campus of the University of Massachusetts Boston; provided further, that $120,000 shall be expended  for an emergency access road to and from Plum Island in Newbury; provided further, that $65,000 shall be expended for the removal of an unsafe chain link fence on Pond street in Georgetown and the replacement of said fence with a guardrail; provided further, $2,500,000 shall be expended for the development of a parking garage downtown in the city of Greenfield; provided further, that $3,000,000 shall be expended for the completion of design and construction of the Inlet Bridge connecting the North Point Park to the O’Brien Highway in Cambridge; provided further,  that $1,000,000 shall be expended for the reconstruction design of  Village street in Millis from Main street to the Medway town line; provided further, that $4,600,000 shall be expended for the engineering and drainage installation on Lake street, Goulding street west, and Forest street in Sherborn; provided further,  that $4,100,000 shall be expended for improvements to the Route 27 and Route 9 intersection in Natick; provided further, that $500,000 shall be expended for the design and installation of a walkway from the Woodhaven Senior Housing Complex to the downtown area in Sherborn; “; provided further, that $3,000,000 shall be expended for the construction of the Cochituate Rail Trail in  Natick; provided further, that $400,000 shall be expended for the crossing of I-91 in the vicinity of the Chestnut street bridge by an infrastructure improvement project in the town of Hatfield; provided further, that $1,500,000 shall be expended for safety and pedestrian crossings at the intersection of Franklin street and Main street on Route 28 in the town of Reading; provided further, that $500,000 shall be expended to study the replacement of the Main street bridge and the Lawrence street bridge in the town of Norfolk; provided further, that $2,000,000 shall be expended for the study, design, and construction as dated for the traffic light fixture at route 44 (Winthrop street) and route 118 (Bay State road) in the town of Rehoboth; provided further that $5,500,000 shall be expended for reconstruction and repaving on Route 133 in the town of Rowley; provided further, that $500,000 shall be expended for the repair and reconstruction for the culvert located on Route 22 in the town of Wenham; provided further, that $950,000 shall be expended  to complete the resurfacing and related work required to install a new surface wearing course of asphalt pavement on route 97 in Topsfield; provided further, that $750,000 shall be expended for the design, acquisition, engineering, and construction of an intermodal park and ride facility in the town of Athol; provided, that $300,000 shall be expended to complete phase two repairs of the Athol Depot owned by Montachusett Area Regional Transit and for construction and maintenance of the station; provided further, that $175,000 shall be expended for a ticket platform for the Berkshire Scenic Railway in either the town of Adams or the city of North Adams; provided, further that $100,000 shall be expended for the installation of three additional MBTA Bus Shelters one at the intersection of Cummins highway and River street  and two on Blue Hill avenue in Mattapan square in the Mattapan section of the city of Boston; provided further, that $145,000 shall be expended for the installation of a wireless coordination system  in downtown Waltham for 25 identified traffic signals along Main street, Moody street, and adjacent side streets; provided further, that $500,000 shall be expended to make Newton Highlands Station located along the green line in the city of Newton fully accessible, including but not limited to, the design and construction of a path of travel from the street level to the station; provided further, that $1,500,000 shall be expended to raise the station platform at Newton Highlands Station located along the green line in the city of Newton approximately 8 inches to accommodate low car trains; provided further, that $250,000 shall be expended for completion of design and construction of the the Quinebaug Valley Rail Trail in the town of Southbridge; provided further, that $20,000 shall be expended for the design and reconstruction of the traffic signal system at the intersection of Route 12 and Route 197 in the town of Dudley; provided further, that $10,000,000 shall be expended for the design and construction of a pedestrian footbridge over the Massachusetts Turnpike with an entry and exit point for the north side of the footbridge on Lincoln street between Antwerp street and South Waverly street in the city of Boston and an entry and exit point on the south side of the footbridge at the proposed New Boston Landing commuter rail stop; provided further, that $200,000 shall be expended to determine the feasibility of erecting a pedestrian footbridge over the VFW Highway at the intersection of University Avenue in the City of Lowell; provided further, that $1,500,000 shall be expended for the design of a rail trail in the Grand Junction Railroad corridor in the cities of Cambridge, Somerville, and Boston; provided further, that $65,000 shall be expended for repairs of the Downtown Village sidewalks in the town of Charlton; provided, further that $250,000 shall be expended for completion of the engineering drawings for the Mystic River Greenway, as indicated on the Department of Conservation and Recreation's Mystic River Master Plan