Amendment #2 to H4599
Turnpike Street
Representatives Kafka of Stoughton and Galvin of Canton move to amend the bill in Section 2D, in line item 6121-1315, by adding at the end the following: “provided further, that not less than $12,000,250 shall be expended for the reconstruction of Turnpike Street in the Town of Stoughton to combat roadway settlement caused by of a vast depth of decomposing subsurface material;”, and by striking the figures “$55,000,000” and replacing it with the following figures “$67,000,250”