Budget Amendment ID: FY2018-S3-784-R1
Redraft ENV 784
Sturbridge Water Line Study
Ms. Gobi moved that the proposed new text be amended in section 2, in item 2250-2000, by adding the following:- “provided further, that not less than $75,000 shall be expended for costs related to the study, planning, and engineering of a water line connection in the Town of Sturbridge;” and by striking out the figures “$2,743,531” and inserting in place thereof the following figures “$2,818,531”.