Amendment ID: S2813-122
Amendment 122
Bourne and Sagamore Bridges
Ms. Moran and Mr. Cyr move that the proposed new text be amended in section 2A by inserting after item 6121-2117 the following item:
“6121-2147 For the planning, study, design, construction, reconstruction, resurfacing, repair, climate change adaptation, multi-modal access and improvement of transportation infrastructure associated with the approaches to the Bourne bridge and the Sagamore bridge and other transportation infrastructure improvements to enhance the traffic safety, traffic flow and ease congestion at the Bourne bridge and the Sagamore bridge, respectively, and to prepare for and to leverage federal investments and improvements to each bridge; provided, that said improvements shall include, but not be limited to, highway, interchange and non-highway improvements as well as elements that improve access for all modes, pavement, surface conditions, approaches, ramps, rotaries, exits, alignments, lane enhancements, signage and safety features; provided further, that this item may also be expended for costs associated with the planning, study, design, construction, reconstruction, resurfacing, repair, multi-modal access and improvement of transportation infrastructure in and around the Cape Cod canal area including in the towns of Bourne and Sandwich; and provided further, that expenditures from this item may include the costs of engineering, design, permitting, climate change adaptation and resilience and other services essential to projects under this item.......................................................................................................$350,000,000”.