Amendment #349 to H5007
Town of Plymouth replacement of boardwalk along Plymouth Harbor at the Town Boat ramp
Mr. Muratore of Plymouth moves to amend the bill in section 2A, in line1599-6075, by adding the following: “; and provided further, that not less than $125,000 be allocated to the Town of Plymouth to replace a deteriorating wooden boardwalk along Plymouth Harbor at the Town Boat ramp with a resilient pedestrian walkway, lighting, and rails to improve safety and public access.”; and in said item by striking out the figures “$175,000,000” and inserting in place thereof the figures “$175,125,000”.
Additional co-sponsor(s) added to Amendment #349 to H5007
Town of Plymouth replacement of boardwalk along Plymouth Harbor at the Town Boat ramp
Representative: |
Kathleen R. LaNatra |