Amendment ID: S2989-3-R2

2nd Redraft Amendment 3

West Bridgewater Pedestrian Improvements

Messrs. Timilty and Pacheco move that the proposed new text be amended in section 2F, in item 6720-2261, by adding the following words:- "; provided further, that not less than $200,000 shall be expended for sidewalk installation and repairs in the town of West Bridgewater;  provided further, that not less than $500,000 shall be expended for the engineering and redesign of Central Square in the town of Bridgewater; and provided further, that not less than $500,000 shall be expended for the downtown sidewalk replacement plan in the town of Bridgewater; and provided further, that not less than $525,000 shall be expended for the signalization of the Matfield street and state highway route 28 intersection in the town of West Bridgewater"; and by striking out the figure "$1,000,000" and inserting in place thereof the following figure:- "$2,725,000".