Amendment #1019 to H5500
Savin Hill Beach Reservation
Mr. Hunt of Boston moves to amend the bill in section 2, in item 7008-1116, in line 1, by inserting after "projects", the following: ";provided further that no less than $250,00 shall be expended for the redesign, study, permitting, and engineering of Savin Hill Beach Reservation in the Dorchester section of Boston"; and in said item by striking the figures "$100,000" and inserting in place thereof the figures "$350,00".