Amendment #180 to S3064

Slack Brook Flood Mitigation Project

Ms. Higgins of Leominster moves to amend the bill in section 2C, in item 2000-7089, in line 363, by inserting after "projects" the following: "; provided further that not less than $500,000 shall be expended for design and engineering for repair of flood damage to Slack Brook on Exchange Street in the City of Leominster”; and in said item by striking out the figures "$100,000" and inserting in place thereof the figures "$600,000”.