Amendment #226 to S3064

Savin Hill Beach Reservation

Mr. Hunt of Boston moves to amend the bill in section 2C, in item 2000-7089, in line 879, by inserting after "development", the following: ";provided further that no less than $2,500,000 shall be expended for the redesign, study, permitting, and engineering of Savin Hill Beach Reservation in the Dorchester section of Boston"; and in said item by striking the figures "$179,810,000" and inserting in place thereof the figures "$182,310,000".