Amendment #361 to S3064
North Shore Water Resilience Task Force Support
Ms. Kerans of Danvers moves to amend the bill in section 2, in item 2000-7089, in line 363, by inserting after "projects" the following: "provided further, that not less than $1,250,000 shall be expended to the metropolitan area planning council, in coordination with the North Shore water resilience task force for costs associated with planning, feasibility analyses, environmental review, engineering, design, permitting and construction of water supply and distribution infrastructure improvements in the Ipswich river basin to increase the reliability of public water supplies and the environmental health of the Ipswich river"; and in said item by striking out the figures "100,000" and inserting in place thereof the figures "1,350,000".
Additional co-sponsor(s) added to Amendment #361 to S3064
North Shore Water Resilience Task Force Support
Representative: |
Adrianne Pusateri Ramos |
Hannah Bowen |
Steven Ultrino |
Kristin E. Kassner |
Tram T. Nguyen |
Marjorie C. Decker |
Manny Cruz |