Amendment #83 to S3064

Charles River Dredging Feasibility Study

Representatives Owens of Watertown and Lawn of Watertown move to amend the bill in section 2, in item 2800-7026, in line 44, by inserting after “environment” the following:

“provided further, that not less than $500,000 shall be expended by the department of conservation and recreation for a climate resilience, flood mitigation, and dredging feasibility study of the Charles River between the Galen Street Bridge and the Arsenal Street Bridge. Said study shall include sediment characterization, hydrologic and hydraulic analysis, environmental review, permitting requirements, engineering assessments, cost estimates, water quality impacts, habitat restoration opportunities, and recommendations for dredging and long-term sediment management to improve flood storage capacity, ecological health, climate resilience, and public access along the Charles River.”;

and in said item by striking out the figures “$308,100,000” and inserting in place thereof the figures “$308,600,000”.


Additional co-sponsor(s) added to Amendment #83 to S3064

Charles River Dredging Feasibility Study

Representative:

Amy Mah Sangiolo

Greg Schwartz

Sean Garballey

Marjorie C. Decker

Samantha Montaño

Mike Connolly