{"AmendmentNumber":"73","ParentBillNumber":"H5151","Bill":null,"Sponsor":{"Id":"D_R1","Name":"David Allen Robertson","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/D_R1","ResponseDate":"2026-02-25T15:59:44.23"},"Category":null,"Action":"Consolidated","RollCall":[],"Title":"DG Interconnection Paymennt Modifications","Branch":"House","RedraftNumber":null,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Mr. Robertson of Tewksbury moves to amend the bill in Section 39 by inserting the following language in proposed \r\nMr Robertson of Tewksbury moves to amend Section 92D(a) of G.L. c. 164, in the first sentence by striking the word “the commencement of”\r\nand inserting in place the words:-\r\n“incurring costs to conduct engineering, procurement and”\r\nHouse 5151 is hereby amended in Section 39 by inserting the following language in proposed\r\nSection 92D(a) of G.L. c. 164, in the second sentence by striking the words “anticipating\r\nspending and costs” and inserting in place the words:-\r\n“actual spending and costs to be”\r\nHouse 5151 is hereby amended in Section 39 by inserting the following language in proposed\r\nSection 92D(a) of G.L. c. 164, in the second sentence by striking the words “or following the\r\ncompletion of construction” and inserting in place the following words after the phrase “incurred\r\nby the electric distribution company”:-\r\n“to perform engineering, procure equipment and construct system modifications to interconnect a\r\ndistributed generation facility of the interconnecting customer within 60 business days, or”\r\nHouse 5151 is hereby amended in Section 39 by inserting the following language in proposed\r\nSection 92D of G.L. c. 164, by striking proposed subsection (b) in its entirety.\r\n"}