{"AmendmentNumber":"607","ParentBillNumber":"H5562","Bill":null,"Sponsor":{"Id":"AMS2","Name":"Alyson M. Sullivan-Almeida","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/AMS2","ResponseDate":"2026-07-06T16:43:12.367"},"Category":null,"Action":"Consolidated","RollCall":[],"Title":"Abington Rockland Joint Water works Project","Branch":"House","RedraftNumber":null,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Representatives Sullivan-Almeida of Abington and DeCoste of Norwell move to amend the bill  in section 2, in item 7002-8087, by inserting at the end thereof the following:-\r\n“; provided further, that not less than $7,500,000 shall be expended for the town of Abington to build a water supply line from Brockton Water through the town of Abington down Brockton Avenue to 366 Centre Avenue in the town Rockland to the Rockland/Abington Joint Waterworks to allow for economic development for commercial and residential development throughout the town of Abington”\r\n"}