{"AmendmentNumber":"214","ParentBillNumber":"S2512","Bill":null,"Sponsor":{"Id":"N_C0","Name":"Nick Collins","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/N_C0","ResponseDate":"2025-05-07T17:33:57.243"},"Category":null,"Action":"Adopted","RollCall":[],"Title":"Transportation Infrastructure ","Branch":"Senate","RedraftNumber":1,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Mr. Collins moves that the proposed new text be amended  in section 2A, in item 1596-2507, by adding the following words:- “; provided further, that not less than $250,000 shall be expended to the Massachusetts Port Authority for the study and planning of transportation assets including but not limited to evaluating vehicular movements connecting to the interstate highway system, truck routes identified in Massachusetts Department of Transportation's Freight Plan, Massachusetts Bay Transportation Authority transit service, including but not limited to the #7, #9 and Silver Line, pedestrian safety and waterfront access within the Port of Boston including the extension and expansion of the Harborwalk ; provided further, that the Massachusetts Ports Authority shall conclude the report by June 1, 2026, provided further, that no later than June 30, 2026 the Massachusetts Port Authority shall report to the clerks of the senate and house of representatives detailing plans for capital improvements funded in this item”, and by striking out the figure “$100,000” and inserting in place thereof the following figure:- “$350,000”.\r\n"}