{"AmendmentNumber":"1036","ParentBillNumber":"S3","Bill":null,"Sponsor":{"Id":"KAD0","Name":"Kelly A. Dooner","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/KAD0","ResponseDate":"2025-05-09T12:36:11.293"},"Category":"Local","Action":"Rejected","RollCall":[],"Title":"Taunton Regional WWTF Groundwater Discharge Expansion","Branch":"Senate","RedraftNumber":null,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Mrs. Dooner moved that the proposed new text be amended in section 2, in item 1599-0026, by adding the following words:-“; provided further, that not less than $234,000 shall be expended for the design, site assessment, and estimated construction costs associated with the development of a proposed groundwater discharge site and secondary discharge for the city of Taunton’s wastewater treatment facility, which serves as a regional sewer system supporting Taunton, Raynham, Dighton, and portions of Norton.”; and by striking out the figure “$10,000,000” and inserting in place thereof the following figure:- “$10,234,000”.\r\n"}