{"AmendmentNumber":"181","ParentBillNumber":"S3050","Bill":null,"Sponsor":{"Id":"PWM0","Name":"Paul W. Mark","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/PWM0","ResponseDate":"2026-04-15T13:19:38.633"},"Category":null,"Action":"Adopted","RollCall":[],"Title":"Great Barrington/Housatonic Water Works","Branch":"Senate","RedraftNumber":1,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Mr. Mark moves that the proposed new draft be amended in section 2C, line item 2000-7089, by adding the following words:- \"; provided further, that not less than $250,000 shall be expended to the town of Great Barrington, in consultation with the Housatonic Water Works Company, for filtration and interconnection projects between the Great Barrington fire district water department and the Housatonic Water Works Company\"; and by striking out the figure \"$100,000” and inserting in place thereof the following figure:- \"$350,000”. \r\n"}