{"AmendmentNumber":"301","ParentBillNumber":"S3050","Bill":null,"Sponsor":{"Id":"KAD0","Name":"Kelly A. Dooner","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/KAD0","ResponseDate":"2026-04-10T14:59:49.89"},"Category":null,"Action":"Adopted","RollCall":[],"Title":"Raynham – Pine Street Culvert Replacement","Branch":"Senate","RedraftNumber":null,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Mrs. Dooner moves that the proposed new draft be amended in section 2C, in item 2000-7089, by inserting after the words “for local environmental, recreational, resiliency and preservation projects” the following words:- “; provided further, that not less than $2,500,000 shall be expended to the town of Raynham for the replacement of the Pine Street culvert to improve stormwater flow, enhance climate resiliency, restore aquatic connectivity and protect public safety and access for residents”; and by striking out the figure “$100,000” and inserting in place thereof the following figure:- “$2,600,000”.\r\n"}