{"AmendmentNumber":"18","ParentBillNumber":"S3143","Bill":null,"Sponsor":{"Id":"BET0","Name":"Bruce E. Tarr","Type":1,"Details":"https://malegislature.gov/api/GeneralCourts/194/LegislativeMembers/BET0","ResponseDate":"2026-06-24T15:57:38.76"},"Category":null,"Action":"Rejected","RollCall":[],"Title":"Clean Energy Generation","Branch":"Senate","RedraftNumber":null,"IsFurther":false,"GeneralCourtNumber":194,"Text":"Mr. Tarr moves that the proposed new text be amended by inserting after section _ the following section:-\r\n\"SECTION_. Section 3 of said chapter 25A, as so appearing, is hereby amended by striking out the definition of “Qualified RPS resource” and inserting in place thereof the following definition:-\r\n\t“Qualified RPS resource”, a renewable energy generating source, as defined in subsection (c) or subsection (d) of section 11F, that has: (i) installed a qualified energy storage system at its facility; or (ii) commenced operation on or after January 1, 2019, provided, however, that a qualified RPS resource that commenced operation prior to January 1, 2019 shall be considered to have the commercial operation date of when the resource is co-located or contractually paired with a qualified energy storage system that commenced operation after January 1, 2019 and having a minimum nominal useful energy capacity of not less than 25 per cent of the nameplate power rating of the qualified RPS resource for 4 hours.\"\r\n"}