Refine Search Results
Search Results Table
| Result Summary | |||
|---|---|---|---|
| S.2477 |
115
|
Comerford, Joanne M. |
Procedures for Interconnection
systems with a Maximum Generation Capacity of 50 kW or greater and less than 500 kW, and within 1 year of the execution of the ... |
| S.2829 |
94
|
Comerford, Joanne M. |
Reasonable Standards for Interconnection
For projects with an export capacity between 60 kW and 500 kW the following standardized interconnection cost allocation shall ... |
| S.2545 |
43
(2nd Redraft)
|
Chang-Diaz, Sonia |
Ensuring fair access to solar
by inserting after section 14 the following sections: "SECTION XX ... solar incentive program, including set-asides for solar units less than or equal to 25 kW ... |
| S.2829 |
25
|
Eldridge, James B. |
Solar Energy Incentive
by adding the following section:- "SECTION XXX ... SECTION 1. Subsection (d) of section 6 of ... established a program goal of at least 3000 kW under subsection (b), then it shall file a ... |
| S.2477 |
79
|
Chang-Diaz, Sonia |
Low-income and community solar access
in line 583 following SECTION 46, by inserting the following sections:- SECTION X ... excess of those produced annually by 25 kW of nameplate AC capacity and the combined share ... |
| S.1973 |
18
|
Downing, Benjamin B. |
Solar Incentive Program
receive no more than the amount of credits produced annually by 25 kW AC capacity ... SECTION X. Said chapter 25A is further amended by inserting after section 11I the following ... |