Refine Search Results
Search Results Table
| Result Summary | |||
|---|---|---|---|
| H.4714 |
188
|
Kelcourse, James M. |
Newburyport Rt. 1 Improvements
in section 2, in item 7002-8006, by adding the following: “provided further, that $500,000 shall be expended for improvements and repairs to the Route 1 corridor located in the ... |
| H.4879 |
376
|
Barrows, F. Jay |
Norton Rt. 123 Expansion
in section 2, in item 7002-8031 by adding after the words “fiscal year”, in line 98, the following:- “provided further that not less than $1,000,000 shall be expended for ... |
| H.4400 |
442
|
Gentile, Carmine L. |
Sudbury Rt. 20 Sewer Planning
moves to amend the bill in section 2 by adding in line item 7004-0099 the following: “; provided further that no less than $1,000,000 shall be expended for the Town of Sudbury ... |
| H.4897 |
176
|
Dooley, Shawn |
Wrentham Rt 140/Lake Archer Discharge Fix
the study, engineering, and repairs of Rt 140/Franklin St; including curbing, catch basins ... |
| H.4506 |
111
|
Gouveia, Tami L. |
Rt. 2 Bus Rapid Transit
in section 2E, in item 6621-2108, in line 113, by inserting after "Better Bus Project;” the following: “provided further, that not less than $600,000 shall be expended for the ... |
| H.4707 |
309
|
Jones, Jr., Bradley H. |
Improvements to Rt. 114 in Middleton
in section 2, in item 7004-0074, by inserting at the end thereof the following: “, provided further, that not less than $2,500,000 shall be expended to the town of Middleton for ... |
| H.4200 |
725
|
Lombardo, Marc T. |
Sidewalks on Rt 3A in Billerica
moves to amend the bill in section 2, by inserting after item 1599-0026 the following item:- “and provided further, that not less than $2,000,000 shall be expended for the design ... |
| H.4179 |
267
|
Levy, Steven L. |
Reconstruction of Maple Street (Rt 85) in Marlborough
and sidewalk reconstruction of Maple Street (Rt 85) from the Southborough town line to ... |
| H.3400 |
583
|
Nyman, Rhonda L. |
Road Improvements for Rt. 123 in Norwell
moves to amend the bill in section 2, in item 7002-0021, in line 5, by inserting after "a ratio of at least 3:1" the following: "provided further, that not less than three million ... |
| H.4506 |
69
|
Peisch, Alice Hanlon |
Signalization of Bacon Street and Rt. 135
in section 2, in item 6122-2124, in line 38, by inserting after “established by the department” the following: "; and provided further, that not less than $300,000 shall be ... |
| H.4000 |
1378
|
Walsh, Thomas P. |
Privacy Fence at rt 1/95 Interchange
moves to amend the bill, in section 2, in line item 1595-6368 by adding at the end thereof the following: “; provided further that not less than $50,000 shall be expended for ... |
| H.4179 |
149
|
Webster, Daniel K. |
Traffc Light, Intersection State Rt. 53 & Pleasant St, Town of Pembroke
light and subsequent road work to state highway Rt. 53 and Pleasant St. in the Town of ... |
| H.4219 |
208
|
Dooley, Shawn |
Repave Main St/Rt 109 in the Town of Millis
in section 2A, in item 1599-2030, by inserting after the word “prioritized” the following:- “; provided further that not less than $100,000 shall be expended to repave Route 109 ... |
| H.4897 |
202
|
LeBoeuf, David Henry Argosky |
Improving Bike- and Walkability on Leicester Main Street/Rt 9
in section 2F, in item 6720-2258, by adding the following: “provided that not less than $7,000,000 be expended for pedestrian safety improvements on Main Street (Route 9) in the ... |
| H.5150 |
170
|
Barrett, III, John |
$350,000 for resurfacing Rt. 116 in the Town of Cheshire
moves to amend the bill in section 2, item 1595-6368, in line 2, by inserting after “Laws” the following: “provided further, that not less than $350,000 shall be expended for the ... |
| H.4200 |
633
|
Barrows, F. Jay |
Norton Fence Restoration
be expended for the restoration of the iron ore fence on the corner of Rt. 123 and Rt. 140 |
| H.3600 |
253
|
Barrows, F. Jay |
Norton Fence Restoration
be expended for the restoration of the iron ore fence on the corner of Rt. 123 and Rt. 140 |
| S.4 |
464
|
Joyce, Brian A. |
Randolph Traffic Study
for a traffic study along the Rt. 28 corridor to investigate turning lanes, traffic signal ... and other necessary improvements along Rt. 28 including the intersections of Russ and ... |
| H.4100 |
511
|
Timilty, Walter F. |
Randolph Traffic Study
XX: For a traffic study along the Rt. 28 corridor to investigate turning lanes, traffic ... and other necessary improvements along Rt. 28 including the intersections of Russ and ... |
| H.4179 |
131
|
Timilty, Walter F. |
Randolph Traffic Study
for a traffic study along the Rt. 28 corridor to investigate turning lanes, traffic ... and other necessary improvements along Rt. 28 including the intersections of Russ and ... |
| H.4400 |
632
|
Barrows, F. Jay |
Norton Master Planning
and economic development of the re-zoned parcels of Rt. 140 and Rt. 123 in the Town of Norton, to modernize and ... |
| H.4165 |
155
|
Naughton, Harold P. |
Regional Economic Development
XXXX-XXXX- For the development of the Rt. 140 Corridor in the Town of Boylston to ... |
| S.4 |
459
|
Joyce, Brian A. |
Easton Traffic Reconstruction II
at the intersection of Elm Street and Washington Street, Rt. 138 in the Town of Easton |
| S.4 |
458
|
Joyce, Brian A. |
Easton Traffic Reconstruction I
at the intersection of Union Street and Washington Street, Rt. 138 in the Town of Easton |
| H.4165 |
142
|
Naughton, Harold P. |
Regional Economic Development Infastructure
improved transportation between Center Street and Rt. 290 at Church Street to allow for ... |